Product · Power Cell

Firm pad power, gas or grid.

Power is the bottleneck of the AI era. Each Power Cell is factory-built for ~6 MW firm on the facility bus, enough for one 5 MW Data Cell with margin. Choose natural gas (N+1 gensets, grid-forming BESS, E-House / MV, gas metering) or power-ready (utility interconnect, BESS, E-House, no gensets).

Standard SKU · 6 MW firm

The Power Cell stack

Nine units. Four layers.

The gas Power Cell packages the path from fuel to a ~6 MW firm facility bus as nine factory-built units: a gas metering / regulation skid, four genset enclosures (3+1), three BESS enclosures, and one E-House. One 5 MW Data Cell sees stable capacity after cooling and distribution overhead, without a multi-year utility schedule. Scale by adding matched cells.

01
Pipeline gas + metering skid

A pipeline tap feeds a factory-built gas metering / regulation skid. Fuel comes from US pipeline / midstream gas (city gate or lateral), with no baseload liquid-fuel trucking.

02
Gas generation, N+1 (3+1)

Four industrial natural-gas genset enclosures (~2.0–2.5 MWe class each, 60 Hz). Three carry ~6 MW continuous; the fourth covers maintenance or a trip. Gensets run ramp-limited while the BESS takes fast load steps.

03
Grid-forming BESS (1–2 h default)

Three BESS enclosures with ≥~6 MW PCS on the facility bus. Rack-scale AI can swing a large share of IT load in under a second; the grid-forming BESS carries the step (target: full Data Cell step within ~100 ms) and handles ride-through. It does not replace continuous generation.

04
E-House / MV switchgear

One factory-integrated electrical house with MV switchgear and protection, rated for fast load steps. It is the clean interface to the Data Cell electrical modules, with reserved space for a future 800 VDC conversion bay.

Gas Power Cell with all 9 units labeled: metering skid, 4 gensets, 3 BESS, E-House
~6 MW firm Power Cell, gas package: 1 metering skid · 4 genset enclosures (N+1) · 3 BESS · 1 E-House = 9 units.

Inside the cell

Built for firm AI loads.

Generation, storage, and distribution arrive as factory-tested modules and are commissioned together as one cell, ready to repeat in parallel as pad load grows.

Generation

Gas gensets · N+1 (3+1)

Continuous, firm energy from pipeline gas. N+1 keeps ~6 MW on the facility bus with one unit out, enough for 5 MW IT plus cooling and distribution overhead.

Storage

Grid-forming BESS · ≥~6 MW PCS

1–2 h usable by default (~6–12 MWh class) across three enclosures, for load-swing buffering, ride-through, and genset coordination. ~4 h only when island or tariff products require it.

Distribution

E-House & MV switchgear

Medium-voltage collection, protection, and the standardized Power Cell → Data Cell interface, factory-tested before shipment. Used in both packages.

Internals

Battery rack systems

Rack-level energy storage inside each BESS enclosure, with liquid-cooled packs engineered for industrial duty cycles and UL 9540 / NFPA 855 siting.

Two configurations

Gas generation or power-ready.

Both deliver ~6 MW firm to the same 14-module 5 MW Data Cell. Choose based on what the site already has.

Product visuals

Single-module views and interiors. Each shows one enclosure of the set.

Detail gallery · DET-PC1–PC4

Power Cell 6 MW firm design envelope
Catalog rating ~6 MW firm Power Cell — ~6 MW firm facility bus for one 5 MW Data Cell. Warm-water liquid cooling puts peak facility factor at ~1.07–1.16, so 6 MW holds with margin
Package A · gas (9 units) 1 gas metering / regulation skid · 4 genset enclosures (N+1, 3+1) · 3 BESS enclosures · 1 E-House / MV
Package B · power-ready (4 units) Utility interconnect / substation tie (utility or site scope) · 3 BESS enclosures · 1 E-House / MV · no gensets, no gas line
Generation · N+1 Package A: pipeline natural gas, 60 Hz reciprocating gensets, 3+1 at ~2.0–2.5 MWe class each, so ~6 MW continuous remains with one unit offline
BESS (default) Grid-forming, ≥~6 MW PCS on the facility bus; 1–2 h usable (~6–12 MWh class). Carries AI load swings (target: full Data Cell step within ~100 ms) while gensets run ramp-limited. ~4 h only if island / tariff products require it
Electrical BOP Factory E-House / MV switchgear → Data Cell electrical modules (indicative 11–34.5 kV MV class; site-locked); reserved 800 VDC conversion bay
Fire / life safety BESS to UL 9540 with UL 9540A test data and NFPA 855 siting; gensets and fuel gas per NFPA 37 / 54
Lead-time long pole Gas genset manufacturing slots ~60–110 weeks (industry-cited, indicative). GridCell planning bands: Gas ~34–46 weeks; Power-ready ~28–38 weeks. BESS / E-House / Data Cell factory paths are typically shorter than industry genset extremes.
Scale-out Multiples of the 5 MW IT brick (10 / 15 / 20 MW IT…) each paired with a ~6 MW firm Power Cell
Delivery Factory-integrated modules + FAT; field focus on foundations, interconnect, commissioning
Pair with Data Cells

Power Cells deliver ~6 MW firm per 5 MW Data Cell. Data Cells turn that capacity into a 5 MW liquid-cooled cell designed for NVIDIA Vera Rubin-class rack-scale systems.