Commercial · Site packages

Reserve by site package.

Choose a Gas-generation or Power-ready site brick—each pairs a 5 MW Data Cell with the matching power side. Or configure custom / standalone SKUs under Advanced. Pricing and payment schedule are provided under NDA with a formal quote.

Two site packages · Quote under NDA · contact@gridcellai.com

Scale-out is additive on 5 MW IT bricks. Gas-generation uses Full Power Cells (genset long pole). Power-ready uses BESS + E-House only when the utility can already deliver ~6 MW firm facility bus.

Site packages

Pick the site type. Then size the block.

Primary commercial choice: Gas-generation vs Power-ready. Selecting a package sets the BOM and planning lead-time band. Use Advanced for Data-only, Power-only, or mixed quantities. List prices are quote-only — not published on this site.

Gas-generation site with 23 labeled units: 9-unit Power Cell and 14-module Data Cell

Package A

GAS-GENERATION SITE

Island / thin-grid / behind-the-meter generation

  • Full Power Cell (9 units): gas metering skid + 4 gensets N+1 + 3 BESS + E-House
  • 5 MW Data Cell (14 modules)
  • 23 factory units per site brick
  • Indicative lead: genset long pole ~34–46 wk

Pricing — Formal quote under NDA. Excl. GPUs / land / interconnect / tariffs unless noted.

Power-ready site with utility substation and 18 labeled units: 4-unit Power Cell and 14-module Data Cell

Package B

POWER-READY SITE

Utility / substation already can deliver ~6 MW firm facility bus

  • Partial Power Cell (4 units): 3 BESS + E-House, no gensets, no gas pipe
  • 5 MW Data Cell (14 modules)
  • 18 factory units + utility substation tie
  • Indicative lead: ~28–38 wk base (not gas 34–46)

Pricing — Formal quote under NDA. Excl. GPUs / land / interconnect / tariffs unless noted.

Cell quantities

Gas-generation package: matched Full Power Cell (9 units) + 5 MW Data Cell (14 modules) per brick. Scale by count (N).

Commercial terms

Pricing and payment schedule are provided under NDA / with a formal quote. Contact contact@gridcellai.com.

Indicative planning lead times (not contractual): Gas-generation ~34–46 weeks; Power-ready / Data ~28–38 weeks. Final lead times are set in the commercial agreement.

Institutional delivery

Repeatable 5 MW blocks, factory FAT, and documentation suited to operators and capital partners—not one-off megaproject theater.

Quote under NDA

List pricing and payment schedule are shared with a formal quote under NDA — not published on this public site. Contact contact@gridcellai.com.

Bands ≠ guarantee

Week ranges are planning tools. Genset long pole applies only when Full Power Cells are in the BOM. Contractual lead times are fixed after site readiness review and commercial close.

Catalog

Two site packages. Standalone still available.

Gas-generation ships a 9-unit Full Power Cell (gas metering skid, 4 gensets N+1, 3 BESS, E-House) with each 14-module 5 MW Data Cell—for island, thin-grid, or behind-the-meter generation. Power-ready ships a 4-unit Power Cell (3 BESS + E-House; no gensets, no gas pipe) with the same Data Cell when the utility / substation can already deliver ~6 MW firm facility bus.

Under Advanced you can still request Data-only, Power-only (full gas Power Cell), or mixed quantities. Commercial terms under NDA / direct quote.

Gas-generation site package: 9 Power Cell units + 14 Data Cell modules
Package A — Gas-generation site: 9 Power Cell units + 14 Data Cell modules = 23.
Power-ready site package: utility substation + 4 Power Cell units + 14 Data Cell modules
Package B — Power-ready site: utility substation tie + 4 Power Cell units + 14 Data Cell modules = 18.