Power Cell
~6 MW firm per 5 MW Data Cell. Gas: metering skid, 4 gensets (N+1), 3 grid-forming BESS, and an E-House (9 factory units). Power-ready: 3 BESS + E-House (4 units).
Power Cell story →Company · US
GRID CELL AI LLC factory-builds Power Cells and Data Cells so US AI sites come online as modules—not megaprojects. Catalog brick: a 5 MW Data Cell designed for NVIDIA Vera Rubin-class rack-scale systems (about 14 modules) and a ~6 MW firm Power Cell (gas or power-ready).
Why GridCell
US pipeline / midstream natural gas access, power-market proximity, and room for pad-scale campuses across the United States. GridCell designs cells that land, energize, and scale block by block for AI tenants and capital partners.
We stay partner-agnostic on the public site: industrial equipment is selected project-by-project. No exclusive OEM claims on these pages.
What we build
Power Cells turn pipeline gas, or a utility interconnect, into firm facility capacity. Data Cells turn that capacity into a standard 5 MW liquid-cooled AI cell. Order them paired or standalone.
~6 MW firm per 5 MW Data Cell. Gas: metering skid, 4 gensets (N+1), 3 grid-forming BESS, and an E-House (9 factory units). Power-ready: 3 BESS + E-House (4 units).
Power Cell story →
5 MW IT at a 330 kW/rack basis: 16 compute + 6 network positions, 100% direct-to-chip liquid cooling at up to 45 °C, in about 14 modules.
Data Cell story →Entity
US entity (filing pending). Public domain gridcellai.com. Commercial terms under NDA / direct quote — contact contact@gridcellai.com.
Quiet affiliate note lives in the footer only.