GRID CELL AI LLC · US

Power and white space, built as cells.

The bottleneck of the AI era is power. GridCell factory-builds Power Cells and Data Cells so US AI sites come online as modules—not megaprojects.

Power Cells 6 MW firm
Data Cells 5 MW IT · Vera Rubin-class design basis
~14-module cell Factory-built, shipped as permit loads
Gas-generation site: ~6 MW firm Power Cell (9 units) beside a 5 MW Data Cell (14 modules) on one fenced pad
Power Cell genset enclosure — one of four N+1 generation units Power-ready site — utility substation, BESS, E-House, and 14-module 5 MW Data Cell

The infrastructure of the AI era

Compute follows power.

Where interconnection queues stretch for years, GridCell brings generation and white space to the pad as factory-built cells. Scale capacity block by block—deploy in months, not years.

01 · Power
Power Cell ~6 MW firm pad power per 5 MW Data Cell. Gas: N+1 gensets, grid-forming BESS, E-House / MV, and gas metering (9 units). Power-ready: utility tie + BESS + E-House (4 units). Power Cell story →
02 · Data
Data Cell A 5 MW IT cell designed for NVIDIA Vera Rubin-class rack-scale systems: 16 compute + 6 network positions at a 330 kW design basis, 100% direct-to-chip liquid cooling, ~14 factory-built modules. Scale as multiples of 5 MW. Data Cell story →
03 · Site
US AI sites Pad-scale campuses across the United States where cells land, energize, and grow in parallel. How a site works →

Product stack

Modular blocks that scale.

Most campuses wait on utility timelines. GridCell pairs Power Cells with Data Cells—factory-built infrastructure you add whenever load demands it.

~6 MW firm Power Cell, gas package: metering skid, 4 N+1 genset enclosures, 3 BESS enclosures, and E-House (9 units)

Power Cell

Power is the bottleneck. Power Cells deliver firm pad capacity from pipeline gas or a utility tie—generation, storage, and medium-voltage distribution engineered as a repeatable set of factory modules.

  • Gas: N+1 gensets (3+1) + grid-forming BESS + E-House + metering skid · 9 units
  • Power-ready: utility interconnect + BESS + E-House · 4 units
  • ~6 MW firm, matched 1:1 to each 5 MW Data Cell
Explore Power Cell →
5 MW Data Cell module set: 2 wide IT modules, CDU module, 2 electrical modules, network module, 7 dry coolers and 1 trim chiller (14 units)

Data Cell

Compute follows power. Data Cells deliver a 5 MW IT cell designed for NVIDIA Vera Rubin-class rack-scale systems—next to the Power Cell that firms it. Campuses scale as multiples of 5 MW.

  • 16 compute + 6 network / storage positions · 330 kW/position basis
  • 100% direct-to-chip liquid · up to 45 °C warm water · CDU N+1
  • ~14 modules: 2 wide IT · CDU · 2 electrical · network · ~8 heat-rejection skids
  • Next-gen option (provisional): ~600 kW/rack, 800 VDC
Explore Data Cell →

Visual family · Vera Rubin design basis

The pad grammar, in eight frames.

Site layouts show the full module count for each package: 9 Power Cell units (gas) or 4 (power-ready), plus the 14-module 5 MW Data Cell. Module close-ups show single enclosures, not whole cells.

How power flows

From fuel to compute, in one pad.

Power Cells generate on site (or firm a utility tie), the E-House distributes capacity across the pad, and Data Cells turn that power into liquid-cooled capacity for AI tenants.

Full system flow →
System flow from fuel and generation through the site bus to Data Cells and AI load
Schematic flow with one icon per stage, not a unit count: gas or utility → Power Cell (9 units gas / 4 power-ready) → 14-module Data Cell.

How a GridCell site works

From factory floor to live pad—in months, not years.

Specify the load

Define power and IT needs for AI tenants. We map Power Cell and Data Cell counts (and their module sets) to a pad-scale site plan.

Factory-build the cells

Modules are fabricated and integrated off-site so field work focuses on foundations, interconnect, and commissioning—not megaproject construction.

Deploy & scale

Set cells on pad, energize, and add capacity one block at a time as demand grows—without redesigning the campus.

Deployment

Built in the US. Deployed for AI.

US manufacturing & deployment

Factory-built cells and pad-scale campuses across the United States—close to gas, power markets, and hyperscale corridors.

Power where compute needs it

Generation and white space co-located on the same pad so AI tenants are not waiting on interconnection alone.

Institutional delivery

Repeatable modules, clear interfaces, and documentation suited to capital partners and operators at larger institutional scale.

Partners

Industrial OEM ecosystem

GridCell sites integrate proven industrial equipment across generation, switchgear, cooling, and controls. The chips below are equipment categories, not partner logos or links — OEM selections are project-driven.

Generation OEMs Switchgear & controls Cooling systems Enclosure fabricators Balance of plant

Categories only — not clickable partner marks. Partner-agnostic by design; we do not claim exclusive OEM partnerships on this site. Delivery steps are summarized on How it works.

Contact

Reserve a conversation. Bring us a site.

Talk to GridCell

Power Cell / Data Cell briefs, site pad inquiries, or introductions for AI tenants and capital partners.

Address — 404 Exposition Ave, Dallas, TX 75226
Entity — GRID CELL AI LLC (US)
Domain — gridcellai.com